Build Information
Spring 2012 Build Dates
We will have 3 Saturday Builds and a few Friday builds if there is enough interest. Builds go from 8:30AM-3:30PM. Pick up is at ITS unless otherwise specified.
Next Build: Will be announced soon! We will most likely begin building again in March.
Build Information
- Builds are from about 8am to 4pm, transportation always provided.
- 6 people are allowed on each build -- priority goes to those who have been at the meetings.
- Transportation is provided by one of the members going on the build.
- Hard-soled, toe-covered shoes are required -- work boots are best.
- You must bring your own lunch. Though they do occasionally treat us!
Alternative Spring Break Trip
In a different location in the US every year during Spring Break. Email the Spring Break Coordinator for more information